Manhole Rehabilitation to Stop Seawater Infiltration
Design, Site Engineering and Crew Training – Crack Injection for a Manhole
Design, Site Engineering and Crew Training – Crack Injection for a Manhole
A backwall grouting program was undertaken to mitigate continual water seepage into two infield tunnels.
ECO trained the maintenance crews of the US Army Corps Of Engineers in Sault St-Marie in professional crack injection with flexible water reactive polyurethane grout as well as slab jacking techniques.
A large inflow in a diamond mine…
A hot bitumen grouting plan was designed and directed to remedy a massive inflow under substantial hydrostatic pressure in a tunnel in Taiwan.
Publication:
A hot bitumen grouting operation to stabilise and stop an inflow of soil in a tunnel…