New Yung Chung Tunnel: Hot Bitumen Grouting, Taiwan
A hot bitumen grouting plan was designed and directed to remedy a massive inflow under substantial hydrostatic pressure in a tunnel in Taiwan.
Publication:
A hot bitumen grouting plan was designed and directed to remedy a massive inflow under substantial hydrostatic pressure in a tunnel in Taiwan.
Publication:
A hot bitumen grouting operation to stabilise and stop an inflow of soil in a tunnel…
ECO designed and directed a variety of grouting rehabilitation projects of historical structures along the Rideau canal…
ECO’s amenability theory was extensively used to supress costs…
A pre-excavation program was designed to tunnel beneath an active CP Rail track…
ECO has designed and directed the construction of several mine plugs and permanent flood bulkheads. The plugs have been used to seal underground works after the ore has been depleted or to seal off areas of a mine where the water inflow impaired or threatened mining operations…