Noranda: Geco Division – Grout Curtain for new Tailings Dam, Manitouwadge, Ontario
ECO’s amenability theory was extensively used to supress costs…
ECO’s amenability theory was extensively used to supress costs…
A pre-excavation program was designed to tunnel beneath an active CP Rail track…
Piping below large primary clarifiers was replaced by sinking shafts in silty soils below the water table. No dewatering was allowed. A multiple pass soil grouting program created a stable, low permeability conglomerate through which the shafts were excavated.
ECO designed and directed a multi-grout, multi-technique post/pre-excavation grouting program to facilitate two mine slopes through water bearing strata. The grouting operation was executed by ECO trained miners.
ECO designed and directed a pre-excavation soil grouting program to stabilize the soils below the US23 artery prior to tunnelling. The tunneling crew was trained by ECO and the grouting operation was monitored in real time via CAGES…
A double row grout curtain was constructed around the perimeter of 2 large diameter (100 plus ft) caisson shafts using acrylamide and cement based suspension grout to stabilize and control the water inflow prior to sinking the shaft through the soil and rock formations.