Excelsior Interceptor 7017 – Pre-Excavation Grouting
Excelsior, Minnesota, 2013 As part of the Excelsior Area Improvement project, a 4-foot diameter tunnel was designed to carry a new 24-inch Forcemain under Highway
Excelsior, Minnesota, 2013 As part of the Excelsior Area Improvement project, a 4-foot diameter tunnel was designed to carry a new 24-inch Forcemain under Highway
A backwall grouting program was undertaken to mitigate continual water seepage into two infield tunnels.
A multiple pass, multiple hole permeation grouting operation directed by ECO was implemented via driven, vertical steel sleeve pipes to encapsulate and contain nuclear waste buried in trenches and prevent the migration of radionuclides.
ECO trained the maintenance crews of the US Army Corps Of Engineers in Sault St-Marie in professional crack injection with flexible water reactive polyurethane grout as well as slab jacking techniques.
In order to prevent erosion (wind & rain), grouting technology was used to stabilize and preserve a historic smelter from the 18th century in Japan. A non-yelowing hydrophobic polyurethane was used to spray on the surface in several passes…
Quick turnaround for grout curtain through rock not amenable to regular or microfine based cement grout.