Pre-Excavation Grouting – Big Walnut Sanitary Trunk Sewer, Columbus, Ohio, USA
ECO designed and directed a pre-excavation soil grouting program to stabilize the soils below the US23 artery prior to tunnelling. The tunneling crew was trained by ECO and the grouting operation was monitored in real time via CAGES…