Landry, Lees, Naudts
Abstract
There are two major components in a soil grouting operation. The first step is the design of a site-specific grouting program. The second step is the execution of that program; this includes on site monitoring and assessment of the operation in real time. If these tasks are undertaken with state-of-the-art engineering methods, then the best achievable results will be predictably accomplished.